EAST DAM TOE DRAIN EXTENSION
Project Name
East Dam Toe Drain Extension
Partner
Copper Mountain Mine
Project Manager
Project Manager Contact
Project Location
Project Award Date
Brook Webster
bwebster@arrow.ca
(250) 571-6085
Copper Mountain Mine
July 2022
Project Completion Date
August 2022
Project Details
Construction of a toe drain at the north end of the East Dam at Copper Mountain Mine. Install and maintain a dam seepage diversion for the duration of construction (24/7 for 1 month). Excavate to embankment while design grades for drain construction. Haul and place backfill using various methods and material types in layers to the desired design limits.
Project Services and Scope
- Excavation of trench to design elevation.
- Backfill of trench to designed elevation with different types of aggregates in layers.
- By-pass pumping and water management.
- Managing all environmental plans and keeping in compliance with the environmental management plans set out by CMM.
- Managing survey for this project including supply of as-builts.
- Staying within all safety guidelines set out by CMM.
- Supplying turnover packages during the course and after the work scope has been completed.
- Supply trucks for the aggregate haul from to job site.